I. Hydropower
1, waterproof construction should use waterproof coating
2. The waterproof project should be done after the concealed project construction is completed and accepted
3, After the completion of waterproof construction to do two water storage test
4, the bathroom waterproof layer should not be less than 1.8 meters
5, floor drain, Yin Yang angle, pipelines and other places to do more waterproof
6, floor drain to use deodorant floor drain
7, hot and cold water left hot right cold
8, try not to walk from the ground
9, cold water pipe in the wall should have a protective layer of 1CM, hot water pipe is 1.5CM, so the slot to open deep
10, install ppr tube is to consider the thickness of the paste tiles, so that the pipe will not be exposed
11, only a few minutes to cook, wash vegetables for a long time, bucket must buy big
12, leading and counter basin to support, can not be installed on the up
13, toilet installation can not use cement, use silicone
14, toilets, taps should be carefully protected after installation
15, to consider the toilet pit when buying a toilet
16, the washing machine to consider whether it is drainage or drainage
17, best not to install the bathroom phone, easy to damp
18, The mirror in the bathroom must first consider the size, otherwise the mirror headlight is very easy to install
19, bathroom pipe is best to leave the access hole
20, weak electricity can not be worn in the same pipe
21, left zero, right phase grounded
22, the power socket is 300 meters away, and the switch is 1.4 meters
23, switch not installed behind the door
24, a lot of sockets should be good
25, high-power electrical appliances with 16A socket, such as electric oven
26, the cassette should be used well
27, cassette must be matched with the panel, otherwise it may not be installed
28, pvc wire conduit cross-sectional area of ​​not more than 40% of the wire tube cross-sectional area
29, bedroom air conditioning do not face the bed
30, air conditioning holes to consider outward tilt, otherwise the rain will come in
31, lights try to consider dual control
32, the best bathroom to install splash socket
33, on the balcony to consider a socket
34, the wire trough should be horizontal and vertical, good photos, later use it
35. The public flues must install the reverse valve
36. The bought electrical appliance must allow workers to read the manual
37. Instructions and warranty cards must be kept

Second, Mason
38. Cement cannot be used for more than three months before it leaves the factory
39. Different types and grades of cement cannot be mixed
40. The yellow sand must use river sand.
41. Wall tiles should be soaked in water for more than two hours.
42, it is better to buy more than a few tiles, do not buy less, or prone to color
43. There cannot be two rows of non-complete bricks on one wall
44. Clean tiles immediately after wiping
45, ground paste marble (light color), stone back to do waterproof
46. ​​To cut a 45-degree angle at the corner of the sun
47. The floor tiles should be inclined toward the floor drain, otherwise it will be easy to collect water
48, Wall tiles meet the pipeline mouth to adopt the form of cut, so it looks like a whole brick
49. Ground marble should be dry
50. Floor tiles must be dirt-resistant, non-slip, and do not look good.
51, matt tiles difficult to clean
52, balcony floor tiles should pay attention to drainage direction


Third, carpentry
53, the best use of dry larch keel
54. After the large wooden plate is bought, it must be sawn and dried.
55. The woodwork enters the field first to play the horizontal line of the house
56. The color panel comes in and you need to buy a paint brush again to prevent it from being contaminated.
57. The ceiling fan cannot be installed on the ceiling keel
58. The color panel must be pre-selected during construction
59. The ceiling of the suspended ceiling must not be greater than 300 from the wall
60. The gypsum board should be fixed with a countersunk head tapping screw, enter the board surface 1~2MM, and do rust treatment, can not use the gun nail
61, the distance between the plasterboard nails shall not be greater than 200
62. The gypsum board has a 3mm seam with the wall for crack prevention
63, the best angle of the gypsum board at the corner to do protection
64. The paint on the top and bottom of the wooden door must be painted
65, the bottom of the bathroom door cover to brush waterproof
66. The size of the door should be the same
67, furniture as far as possible not to do carpentry, do also do bad
68, cabinets try to buy the whole, woodworking is not good, the design is not OK
69. Each medium size must be considered well, and it will be troublesome to change it.
70, do not do the dark track to do their own move the door, no way to repair later
71. If the bathroom is small, try to make a sliding door, do not open the door, take up the place
72. Uncertain woodwork must be communicated with the foremen more than ever. Do not let them make their own claim
73. Money is the hard truth in your hand
74. There are children at home and less use of glass
75. Make sure the workers have a good look at the drawings
76, kitchen drawer is very useful
77, floor wood keel flatness is 5MM
78, wool floor to be paved 30 degrees or 45 degrees, between the board and the board to stay 2 ~ 3MM, stitches should be staggered
79, to leave 8 ~ 10MM seam between the floor and the wall
80. Expansion joints should be considered when the length of the composite floor exceeds 8M
81. Minimize the use of MDF as a door cover
82. The hinges and hardware must be used well
83. The Yuba should be mounted on wooden keels. It cannot be mounted directly on the suspended ceiling.

Fourth, painters
84. Do not add water when using medium and dark latex paint, otherwise it is prone to color
85. Plasterboard joints to be bandages
86. The place where there is a gap on the wall is really cool cloth is better
87, some putty on the original wall is best to get rid of, or brush again glue seal
88. Try to buy paints from well-known brands. Do not use the names recommended by the decoration company or the foreman.
89, the weather is too wet, paint do not brush
90, paint, paint, etc. to be fully polished after drying
91. The next paint must be done after the previous paint is dry
92, metal surface paint to do rust treatment
93. The weather is too cold and the quality of paint construction will be poor
94, when the door is painted, use a textured paper to cover the hinge and door lock
95, too hot, pay attention to ventilation
96, when wallpapering, it is necessary to brush oil on the wall
97. When you are wallpapering, you should remove the panel of switch and socket
98, light, mercerized latex paint to be completed once, make up for the color difference
99. After the baseboard is installed, use putty and latex paint to make up the seam.
100. Frosted glass should be protected with newspapers

The Positive Pressure Dense Phase Pneumatic Conveying System has the features of simple system, flexible layout, reliable operation, high degree of automation, low system investment, high feed gas ratio, low flow rate, small maintenance workload and low annual operating cost. The system includes feeding device, sending warehouse pump, pipelines, valves, reservoir top dedusting device, bottom reservoir gasification device, bottom unloading device, power source, program control device and so on. The warehouse pump has strong structure, good sealing performance, large conveying capacity, long conveying distance, and can meet the requirements of production. The structure is simple. Except for compressed air, there are no transmission parts that come in contact with the materials, so the failure is small and the operation reliability is good.

Pneumatic Conveying System

Pneumatic Conveying System,Samll Pneumatic Conveyor,Pneumatic Transport System

Changzhou Ruide Drying Engineering Technology Co., Ltd , https://www.rddryer.com