Model No.: DR3003
Standards: DIN, GB, ANSI, BSW, JIS
Surface Color: Natural Brass
MOQ: 1000 PCS
Delivery Time: 25-30 Days
Delivery Port: Ningbo
Payment Term: T/T or L/C
Trademark: D&R
Transport Package: Export Standard Packaging
Specification: 1/2"-1"
Origin: Zhejiang, China
HS Code: 8481804090
Brass Female Thread Stop Valve for Water
Key Features:
Item Name: DR Brass Female Thread Stop Valve for Water
Item Number: DR 3003
Body Material: Brass (HPb58-3)
Surface Finish: Natural Brass
Size Range: 1/2'' to 1''
Nominal Pressure: 2.0MPa
Operating Temperature: -10°C to 120°C
Connection Type: Male Thread
Thread Standard: ISO230, NPT, BSP
Medium Compatibility: Water, non-corrosive liquids, and saturated steam (≤0.6MPa)
Application: Industrial, residential, agricultural, and commercial use
Brass Female Thread Stop Valve for Water
Brass Female Thread Stop Valve for Water
Brass Female Thread Stop Valve for Water
Brass Female Thread Stop Valve for Water
Brass Female Thread Stop Valve for Water
Frequently Asked Questions (FAQ):

Q: What is the quality assurance of the valve?
A: We have over 15 years of experience in manufacturing valves, and we offer a 1-year warranty on all products. Our quality control process ensures that every product meets international standards before it leaves our factory.

Q: Can you assist with custom designs if I only have a sketch?
A: Yes, we can help develop the full design based on your sketch. Our engineering team can create detailed drawings and even support ODM (Original Design Manufacturer) projects.

Q: What packaging options are available? Can it be customized?
A: We use standard export packaging, which includes polybags inside cartons on pallets. Customized packaging is possible but may incur additional costs depending on your requirements.

Q: Is air freight an option if I need the products urgently?
A: Yes, air shipping is an option for urgent orders. However, you will be responsible for the air freight charges, which are typically higher than ocean shipping.

Q: How long does it take to receive the product after payment?
A: The production time is usually 25–30 days after receiving the order. Shipping times vary: ocean freight takes about 15–30 days, while air freight takes 4–7 days, depending on the destination port.

Filter Production Line

filter,equipment,partition

ChangZhou FENGJU Machinery Equipment CO., LTD , https://www.fengjumachinery.com